Law library and case analysis · Austria · Belgium · European Union
LAWxPERT Sign in Free account

S.L. 288.2 · Building (Price Control) (Evidence) (S.L. 288.2)

S.L. 288.2 Art. 5Cases in which production of other documents is prescribed.

In forceOfficial text

Where any document is not produced or is not included in the list referred to in regulation 3, its production shall only be allowed:

(a) if, notwithstanding all due diligence, the documents could not be obtained before the filing of the application or of the reply with which it should have been produced, and the filing of the application or the reply could not, without prejudice, be delayed; or

(b) if the Tribunal is satisfied of the necessity or expediency of having the document before it: provided that the Tribunal may in adjudging the costs of the cause, take into account the tardy production of the document; or

(c) if the opposite party, by a separate note, or by an annotation in the margin or at the foot of the note by which the document is produced, gives his consent thereto; or

(d) if it is proved that the party producing the document had not been aware of it, or could not, with the means provided by law, have produced it in due time; or

(e) if the document to be produced is a book or other paper in the original, copies whereof or extracts wherefrom, relating to the matter at issue, were produced in due time.