S.L. 545.27 · Feed-In Tariffs Scheme (Electricity (S.L. 545.27)
S.L. 545.27 Art. 10Obligations of installation operators.
Installation operators shall:
(a) submit such information as the Regulator may reasonably require;
(b) request the prior approval of the Regulator and of the distribution system operator, in the form and manner they may reasonably require, if the solar photovoltaic installation is to be disconnected or transferred, sold or in any form modified in such a way as to degrade its performance during the period of guaranteed payment of the feed-in tariff established in terms of these regulations;
(c) comply at all times with the provisions of the applicable legislation, notification, authorisation, licence conditions and Network Code as approved by the Regulator;
(d) make available to the distribution system operator and to the Regulator data required to be recorded for the purposes of these regulations.