S.L. 545.1 ст. 27Installations to be rendered fit for connection.
Unless an installation that has been found defective is rendered fit for connection to the system within one month from date of the first test, the consumer shall be liable to make good the expense incurred by the distribution system operator in providing and laying the service cable and fixing the main fuse box and meter subject to a minimum fee of €232.93.
История изменений
- Amended by L.N. 52 of 2010