S.L. 499.57 · New Roads And Road Works Regulations (S.L. 499.57)
S.L. 499.57 Art. 48Penalties. No. Item 1 TM A - 1.1 Works on 1.2 Works withinthe bay area,
PART VII
(1) A person committing an offence under regulation 39(1) or regulation 41 is liable to a fine (ammenda) of one thousand five hundred euro (€1,500).
(2) If on completion of the work for which a permit has been issued the contractor does not carry out the re-instatement within forty-eight hours of completion, or within such longer period as may be allowed in the permit, or the re-instatement is not properly carried out, the Authority may ask the Agency to carry out the re-instatement at the expense of the grantee. Such reinstatement expense may be withdrawn from the bank guarantee.
(3) Where reinstatement is effected or remedied by the Authority, the contractor is still responsible for such reinstatement.
(4) The applicant shall be liable in solidum with the contractor which carried out the works to carry out the reinstatement works.
(5) Throughout the carrying out of works, the Authority may give further instructions to the contractor pertaining to any of the conditions in the permit through an addendum to the permit. Failure to immediately comply with the Authority’s instructions shall make the contractor liable to an administrative penalty of fifty euro (€50) per day, without prejudice to any further action that may be taken by the Authority, including the withdrawal of the bank guarantee and suspension of authorization for future road works.
(6) Where a person contravenes any other provision under these regulations he shall be liable to a fine (ammenda) of not less than twenty euro (€20) but not exceeding one thousand five hundred euro (€1,500).
FIRST SCHEDULE (Regulation 31)
The charges payable to the Authority for the grant of a permit shall be as follows:
Permit Processing Fees
(a) Works, not exceeding 10 metres in length, to be carried out in local/ residential roads ........................... €150
(b) Works, exceeding 10 metres in length, to be carried in local/ residential roads RWP1 ................................................ €250 Major Road Works Permit
(c) Works to be carried out in distributor and arterialroads .......................................................... ...... €250
(d) Road construction works ............................................. €500
(a) For each RWP 2 permit issued .................................... €50
(b) For services rendered by the RWP2 Authority official called on site, per Emergency hour or part thereof Road Works ................................ €60 Permit
(c) Penalty where Authority official is called on false emergencies .......................................................... .... €500
(a) Works [excluding those works referred to in paragraph (b) of the definition of "minor works" in regulation 2] in residential roads ................................ €10 RWP3 (b) Works [excluding those works Minor Road referred to in paragraph (b) of the Works, definition of "minor works" in Maintenance regulation 2] in arterial or distributor and Repairs roads ................... €25 Permit
(c) Works on behalf of the Authority and those referred to in paragraph (b) of the definition "minor works" in regulation 2 .......................................................... ....... Nil
SECOND SCHEDULE (Regulations 32, 38)
TRAFFIC MANAGEMENT CLASSIFICATION DURING ROAD WORKS Fine for Minimum Requirements Standard Requirements breach Works on ALL roads not affecting traffic in any way carried out 1. Provide temporary 1. Temporary Traffic €50 footpath pedestrian access Management (Safe route for Arrangements in line carried out pedestrians) with: Safety at parking Inhabited Road Works not