S.L. 499.1 · sl/499.1 (S.L. 499.1)
S.L. 499.1 ст. 73When cargo considered landed.
PART IV
Subject to the provisions of regulations 72 and 90, delivery of cargo shall not be considered to have been made to the Authority or its contractor until the cargo has been safely landed on to the quay or into lighter and has been removed by the Authority or the contractor, as the case may be, from the cargo handling gear used in landing such cargo: Provided that in the case of unit loads or unitised cargo which is rolled off a ship or is otherwise landed by mechanical means through the ship’s side door or ramp, delivery of cargo shall not be considered to have been made to the Authority or its contractor until the cargo has been safely landed onto the quay and has been removed by the Authority or its contractor, as the case may be, from the equipment used in the landing of such cargo. may be, to the ship in good order and condition when placed into the cargo handling gear at the ship’s side whether on the quay or in lighter:
Provided that in the case of unit loads or unitised cargo which is rolled on a ship or is otherwise loaded by mechanical means through the ship’s side door or ramp, such cargo shall, subject to this regulation, be deemed to have been properly delivered by the Authority or its contractor, as the case may be, to the ship in good order when placed in, or attached to, the loading equipment on the quay.
История изменений
- Amended by L.N. 28 of 1973